< Fleischhacker at the Aidex in the heart of Europe
26.02.2019

Aid organisations are now supplied from Kamen


On 01.02.2019 we moved into the approx. 9.000m² large logistics hall in Henry-Everling-Straße 6. At the new location in Kamen, customized modules consisting of medical and laboratory products are picked and dispatched. Customers all over the world are supplied.

The hall is ideal due to the favourable traffic connection at the A1 and A2 motorway junction as well as the optimal size and separation. A total of 9 employees, headed by Mr. Jörg Gohl, have moved to Kamen, where they will find optimal conditions for shipping large projects.

At present, for example, around 1,000 m³ of protective equipment for use in the fight against Ebola for shipment to Ghana and the Congo and 500 extensive modules for medical care in the crisis region in Yemen with a volume of over 6,000 m³ are being prepared.
Translated with www.DeepL.com/Translator